
Published Monday 13 July 2026 · By the JustEng team
A busy stretch for UK infrastructure delivery, safety regulation and the health capital pipeline — here are the developments shaping engineering demand as we move into mid-July.
HS2 completes first ‘green tunnel’ at Copthall
HS2 has revealed the completion of its first cut-and-cover green tunnel at Copthall, near West Ruislip. The 880-metre single-bore structure was built using 1.2 million cubic metres of material excavated from the nearby Northolt twin-bore tunnel, avoiding an estimated 100,000 truck movements. Civil works are now complete and the roof will be landscaped over the next two years. Read HS2’s announcement.
Hiring angle: Green-tunnel completions signal a shift from bulk excavation into mechanical, electrical and systems fit-out on HS2, sustaining demand for tunnel-finishes engineers, railway systems specialists and site-based civil engineers.
NHS gets £300m construction sign-off freedom
The Department of Health and Social Care will now be able to approve NHS capital projects worth up to £300m without Treasury sign-off, under reforms announced on 8 July as part of a 10-year capital plan for health and social care in England. The changes are designed to speed up hospital construction and estate renewal after years of stalled programmes. Construction News has the detail.
Hiring angle: A faster health capital pipeline lifts demand for M&E, structural and healthcare-planning teams; expect renewed pressure on structural engineering salaries in London, Manchester and Leeds.
NSIP planning reforms come into force
From the end of July, mandatory pre-application consultation for Nationally Significant Infrastructure Projects (NSIPs) is being scrapped as part of a wider push to cut planning timelines by up to 12 months. Solar, wind, nuclear, reservoirs and transport links stand to benefit, with the Planning Inspectorate providing earlier technical support to developers. Full detail via Enerdata.
Hiring angle: Compressed planning cycles bring construction start dates forward, tightening the market for design leads, planners and consenting-experienced engineers.
Building Safety Act — Welsh HRB regime live
The Building (Higher-Risk Buildings Procedures) (Wales) Regulations 2025 and Commencement No. 6 (Wales) Regulations 2025 came into force on 1 July 2026, extending the higher-risk buildings regime across Wales. In parallel, developers must have started remediation on at least 80% of buildings requiring works by the end of this month, rising to 100% by July 2027. RWK Goodman’s summary.
Hiring angle: The Welsh HRB rollout and remediation deadlines are fuelling demand for fire engineers, principal designers and competent-person duty holders across residential and mixed-use portfolios.
Construction still the largest insolvency sector
Construction remains the UK’s largest sector by insolvency volume, with 3,803 firms failing in the twelve months to May 2026 — 17% of the national total. Housebuilding activity contracted sharply in the latest PMI reading, and job losses have now continued for an 18th consecutive month. The recent administration of Ardmore Construction Group is being read as a warning shot for tier-one contractors carrying legacy project liabilities. See PBC Today.
Hiring angle: Displaced site and commercial staff are entering the market; well-capitalised consultancies and infrastructure principals are the natural landing pad, particularly for QSs, planners and structural engineers whose sector benchmarks are firming up.
Building your engineering team this quarter? Employers can register a vacancy and engineers looking to move can submit a CV for a confidential conversation with our specialist consultants.
